Delivery & Haulage
Ideally deliveries are made using articulated vehicles with 40ft trailers to the nearest practical point. This size of lorry is the most cost efficient method of delivering materials to site.
If your project requires a smaller rigid vehicle due to site access or storage restrictions then this can be accommodated although it is likely it will incur slightly higher costs.
Deliveries are off loaded using either a tele-handler or crane. If you have chosen to use the Build It Green installation option the installation team will be responsible for the unloading of the vehicle(s).
Please note that if you have chosen to self install the project then you will be responsible for unloading the vehicle(s).
SIP Building System
This was my first use of SIPs and I am delighted with both the product and Build It Green who supplied and installed it. So much so I will be ordering again in a few weeks.More testimonials