Linton School, Kent

Main Contractor: N/A Site Location: Linton, Kent
Client: The Medway Educational Trust Project Type: School

Project Description

The Linton Park School was constructed from Build It Green Structural Insulated Panels with timber frame internal partitions.

The roof was primarily constructed with glu-laminated rafters and SIP panels. The main hall area included a number of pre-engineered glu-laminated feature trusses.

Minimal steel components were used.

Vulcan Weather Board was used to externally clad the building.